front entry under construction

Construction has begun on the front entry of a residence in the Lincoln Heights neighborhood. I designed a 3D model of the existing residence and the proposed entry for my clients, which helped the contractors build the framing and roof for the structure.

20120410-164850.jpg

20120410-164916.jpg

Posted in house design | Tagged , , , | Leave a comment

making wedding invitations

Tonight’s the night for printing wedding invitations. Going with a “Mexican” themed wedding, I chose to stylize our invitations with a papel picado insert. After carving out a linoleum block and trying to perfect technique, finally putting ink to vellum paper.

20111210-190310.jpg

Posted in graphic design | Leave a comment

mobile post

Testing new system with iPhone enabled posting.

Posted in Uncategorized | Leave a comment

under construction

misa workshop is undergoing site development.  Thank you for checking in and please contact us through email if you need any assistance.

Posted in Uncategorized | Tagged | Leave a comment